| Flooring installer overcharged us?
Was hoping to get some input from people more familiar with the issue.
We recently had hardwood installed in our basement. We had a couple quotes and both the quotes estimated a floor size of ~1000 sqft. We found that odd because by our own measurements we counted about 850-900 sqft. However, since both quotes came in at around the same range we said sure, maybe we were wrong.
Fast forward to now, after installation has been complete and we're left with surprise, surprise a lot of leftover wood ~170 sqft (5.5 boxes are left)
Are we entitled for a refund or discount? Even with wastage accounted for they over estimated by 17%. We're being charged for the extra wood and workmanship.
The funny thing is we told them that our measurements were much lower than theirs and they remeasured and still arrived at the same number. What's the general rule here?
TIA!
|
| |
03-01-2013, 05:45 AM
|
#2 | Wanna have a threesome?
Join Date: Oct 2010 Location: Squamish
Posts: 4,889
Thanked 5,054 Times in 1,657 Posts
Failed 439 Times in 203 Posts
| Quote:
Originally Posted by dton13 Was hoping to get some input from people more familiar with the issue.
We recently had hardwood installed in our basement. We had a couple quotes and both the quotes estimated a floor size of ~1000 sqft. We found that odd because by our own measurements we counted about 850-900 sqft. However, since both quotes came in at around the same range we said sure, maybe we were wrong.
Fast forward to now, after installation has been complete and we're left with surprise, surprise a lot of leftover wood ~170 sqft (5.5 boxes are left)
Are we entitled for a refund or discount? Even with wastage accounted for they over estimated by 17%. We're being charged for the extra wood and workmanship.
The funny thing is we told them that our measurements were much lower than theirs and they remeasured and still arrived at the same number. What's the general rule here?
TIA! | In short, no.
10-12% in excess is necessary.
On your project, that amounts to between 87-105 sq/ft.
The case size is 30 sq/ft approx, so the real figure is 90-120 sq/ft or 3-4 cases.
Assuming the safe figure, 120 sq/ft or 4 cases was planned excess necessary to take into consideration.
That means - 50 sq/ft or 1 case was an overestimate in materials.
You're somewhat entitled to a discount on that 1 case.
It would be justified, but some might say trivial if they've done a good job.
As you noted, rounding up a bit is pretty standard.
I won't comment on labour, it's too difficult to speak very accurately on it.
I say that, because the relation between labour and material can vary, they're not always in direct relation to one another.
|
| |
03-01-2013, 07:49 AM
|
#3 | I WANT MY 10 YEARS BACK FROM RS.net!
Join Date: Jan 2006 Location: Abbotstan
Posts: 20,721
Thanked 12,136 Times in 3,361 Posts
Failed 1,848 Times in 413 Posts
| Quote:
Originally Posted by MindBomber 10-12% in excess is necessary. | This. There always needs to be extra to allow for things like... well, for example, if the flooring pieces are 4' long, but your room is 7'2" wide, then it takes two pieces to go across, but there's going to a 10" piece left for every row.
Now assume the boards are 4" wide, and the room is 8' the other way, that's 96 rows... for a total of 96 leftover 10" pieces. Add in things like angles and alcoves, and you end with a lot of leftover bits.
__________________ Quote:
Originally Posted by Godzira Does anyone know how many to a signature? | .. Quote:
Originally Posted by Brianrietta Not a sebberry post goes by where I don't frown and think to myself "so..?" | |
| |
03-01-2013, 07:56 AM
|
#4 | RS controls my life!
Join Date: Nov 2004 Location: Burnaby
Posts: 734
Thanked 135 Times in 51 Posts
Failed 0 Times in 0 Posts
|
Hey MindBomber, thanks for the reply.
I think I wasn't very clear last night. Our actual footage he estimated was 1000 sq/ft. Ordered footage was 1100 sq/ft to account for the 10% wastage (100 sqft).
However after completion, we're now left with 172 sq/ft on top of the wastage which has already been accounted for.
I agree one or even two boxes in excess would be acceptable (lets say ~70 sq/ft). Now on top of that, we're left with an additional 100 sq/ft for which we're asked to pay labour and materials for.
|
| |
03-01-2013, 08:19 AM
|
#5 | Banned By Establishment
Join Date: Dec 2003 Location: New West
Posts: 3,998
Thanked 2,982 Times in 1,135 Posts
Failed 284 Times in 109 Posts
|
On materials...it can happen. Usually, I measure to have one box or so extra. I'd rather have a box left, than have to run out and grab some. I also never buy from places that have a no return policy.
It should be fairly easy to work out with the contractor. Just measure it with him in the room, and say to his face, "so you and I get 900 sq.ft...and yet I get charged for 1000. What up?"
I always charge the install, but buy the waste, meaning if you are buying the material through me, then waste is included in any markup on material, but labour should be the installed floor.
|
| |
03-01-2013, 08:40 AM
|
#6 | I WANT MY 10 YEARS BACK FROM RS.net!
Join Date: Jan 2006 Location: Abbotstan
Posts: 20,721
Thanked 12,136 Times in 3,361 Posts
Failed 1,848 Times in 413 Posts
| Quote:
Originally Posted by Gridlock On materials...it can happen. Usually, I measure to have one box or so extra. I'd rather have a box left, than have to run out and grab some. I also never buy from places that have a no return policy. | Here's your key: if your contractor won't refund you on the extra unopened boxes, then the place he bought from should have - get the receipt from him and take them back.
I don't know about other stores, but when we bought our laminate from Home Repo, they told us any unused, unopened boxes could be returned for full refund. (We ended up with only one unopened so figured it's not worth the hassle, it's always good to have some extra for later, in case damage needs to be repaired or something)
__________________ Quote:
Originally Posted by Godzira Does anyone know how many to a signature? | .. Quote:
Originally Posted by Brianrietta Not a sebberry post goes by where I don't frown and think to myself "so..?" | |
| |
03-01-2013, 11:13 AM
|
#7 | RS controls my life!
Join Date: Nov 2004 Location: Burnaby
Posts: 734
Thanked 135 Times in 51 Posts
Failed 0 Times in 0 Posts
| Quote:
Originally Posted by Gridlock On materials...it can happen. Usually, I measure to have one box or so extra. I'd rather have a box left, than have to run out and grab some. I also never buy from places that have a no return policy.
It should be fairly easy to work out with the contractor. Just measure it with him in the room, and say to his face, "so you and I get 900 sq.ft...and yet I get charged for 1000. What up?"
I always charge the install, but buy the waste, meaning if you are buying the material through me, then waste is included in any markup on material, but labour should be the installed floor. | I appreciate all the input guys.
Ya I was pretty much wondering what industry norms were. Our guy is charging us labour on installed + wastage sq/footage.
Not a big deal by itself, but it is if he's gone over by 3-4 boxes.
|
| |
03-01-2013, 11:17 AM
|
#8 | I WANT MY 10 YEARS BACK FROM RS.net!
Join Date: Jan 2006 Location: Abbotstan
Posts: 20,721
Thanked 12,136 Times in 3,361 Posts
Failed 1,848 Times in 413 Posts
|
Overestimating the amount isn't a big deal, as long as the extra can be returned. Heck, we calculated that we'd need 14 boxes, decided to allow two extras for wastage... and then when we were loading up the cart, went ahead and just rounded up to an even 20, because we knew we could return any unused. Better safe than sorry... better too much than not enough... rather be looking at it than looking for it.
Actually, we're wishing now that we'd bought and kept a couple extra boxes when we redid the dining room 8 years ago: there are some pieces that are trashed, and we don't have enough leftover planks to redo them all... and there's ZERO hope of finding a matching laminate (both grain pattern, and locking edges) with today's stock (in fact, I think the company that made the previous laminate isn't even around anymore).
__________________ Quote:
Originally Posted by Godzira Does anyone know how many to a signature? | .. Quote:
Originally Posted by Brianrietta Not a sebberry post goes by where I don't frown and think to myself "so..?" | |
| |
03-01-2013, 05:30 PM
|
#9 | I WANT MY 10 YEARS BACK FROM RS.net!
Join Date: Jan 2006 Location: Abbotstan
Posts: 20,721
Thanked 12,136 Times in 3,361 Posts
Failed 1,848 Times in 413 Posts
|
^Oh, forgot to mention... as it turned out, the toilet in the half-bath overflowed about two days after the living room floor was done... about HALF of the laminate on that level was ruined and had to be replaced. Good thing we had the extra boxes!
__________________ Quote:
Originally Posted by Godzira Does anyone know how many to a signature? | .. Quote:
Originally Posted by Brianrietta Not a sebberry post goes by where I don't frown and think to myself "so..?" | |
| |
03-01-2013, 05:47 PM
|
#10 | THE CHAMPION OF CAPUA
Join Date: Aug 2005 Location: Batiatus Ludus
Posts: 856
Thanked 187 Times in 64 Posts
Failed 115 Times in 23 Posts
|
how much did everything cost?
|
| |
03-01-2013, 06:53 PM
|
#11 | Rs has made me the man i am today!
Join Date: Oct 2001 Location: Surrey/Guildfor
Posts: 3,321
Thanked 39 Times in 29 Posts
Failed 0 Times in 0 Posts
|
There's always someone of waste but if you're paying someone for their skilled work and he's supplying because it's what he thinks he needs then he better admit when he's wrong. I'm sure you didn't agree nor expect to have uninstalled wood laying around, or did you?
Ask him to lower his invoice based on the materials and labor not used. If that doesn't work then don't pay him.
|
| |
03-01-2013, 07:09 PM
|
#12 | Wanna have a threesome?
Join Date: Oct 2010 Location: Squamish
Posts: 4,889
Thanked 5,054 Times in 1,657 Posts
Failed 439 Times in 203 Posts
| Quote:
Originally Posted by dton13 Hey MindBomber, thanks for the reply.
I think I wasn't very clear last night. Our actual footage he estimated was 1000 sq/ft. Ordered footage was 1100 sq/ft to account for the 10% wastage (100 sqft).
However after completion, we're now left with 172 sq/ft on top of the wastage which has already been accounted for.
I agree one or even two boxes in excess would be acceptable (lets say ~70 sq/ft). Now on top of that, we're left with an additional 100 sq/ft for which we're asked to pay labour and materials for. | Got it, I agree then.
It's difficult to measure perfectly, I certainly have a margin of accuracy. 100 sq/ft off is excessive, though.
Give him a shout.
Last edited by MindBomber; 03-01-2013 at 07:42 PM.
|
| |
03-12-2013, 08:13 PM
|
#13 | Proud to be called a RS Regular!
Join Date: Feb 2013 Location: none
Posts: 143
Thanked 98 Times in 37 Posts
Failed 15 Times in 3 Posts
|
It all depends on how the deal was done:
1, he came out and gave you a price to complete the job. even if he measured wrong and under estimated, he will have to eat it up.
2, he came out to give u an estimate, and gave you a price on how much it would be a sq/ft. this way you get billed on the actual sq/ft used.
Before everyone starts telling him to get a refund and not pay up, we need to know how the deal was was done in the first place. If the deal was A, be happy he left you spare floorings for spare. If the deal was B, go after him and pay him on the amount of flooring used.
Last edited by E60_M5; 03-12-2013 at 08:19 PM.
|
| |
03-14-2013, 04:59 PM
|
#14 | I *heart* Revscene.net very Muchie
Join Date: Nov 2004 Location: vancouver
Posts: 3,674
Thanked 765 Times in 385 Posts
Failed 152 Times in 50 Posts
|
ordering extra is one thing...5 extra boxes is another, i'd ask for a refund on material and labour
|
| |
03-14-2013, 05:17 PM
|
#15 | I WANT MY 10 YEARS BACK FROM RS.net!
Join Date: Jan 2006 Location: Abbotstan
Posts: 20,721
Thanked 12,136 Times in 3,361 Posts
Failed 1,848 Times in 413 Posts
| Quote:
Originally Posted by blkgsr ordering extra is one thing...5 extra boxes is another, i'd ask for a refund on material and labour | Seconded - a bit extra to account for wastage is fine, but it sounds like this guy WAY over-estimated... or just pulled a number out of his ass.
__________________ Quote:
Originally Posted by Godzira Does anyone know how many to a signature? | .. Quote:
Originally Posted by Brianrietta Not a sebberry post goes by where I don't frown and think to myself "so..?" | |
| |
03-15-2013, 12:12 AM
|
#16 | RS controls my life!
Join Date: Nov 2004 Location: Burnaby
Posts: 734
Thanked 135 Times in 51 Posts
Failed 0 Times in 0 Posts
| Quote:
Originally Posted by E60_M5 It all depends on how the deal was done:
1, he came out and gave you a price to complete the job. even if he measured wrong and under estimated, he will have to eat it up.
2, he came out to give u an estimate, and gave you a price on how much it would be a sq/ft. this way you get billed on the actual sq/ft used.
Before everyone starts telling him to get a refund and not pay up, we need to know how the deal was was done in the first place. If the deal was A, be happy he left you spare floorings for spare. If the deal was B, go after him and pay him on the amount of flooring used. | B
we were quoted labour and materials on square footage. At $6 for materials and ~$3 for labour, 172 sq/ft is no joke.
I've been super busy but we're in midst of sorting things out, will post updates soon.
|
| |
03-15-2013, 12:31 AM
|
#17 | MOD MOD MOD MOD MOD
Join Date: Dec 2003 Location: vancouver
Posts: 5,862
Thanked 3,516 Times in 1,160 Posts
Failed 212 Times in 81 Posts
|
172 square feet? wow thats enough to do a whole room.
__________________ Quote: [03-07, 03:26] Yodamaster - The feeling when you quickly insert without hitting the sides | |
| |
03-15-2013, 11:51 AM
|
#18 | Proud to be called a RS Regular!
Join Date: Feb 2013 Location: none
Posts: 143
Thanked 98 Times in 37 Posts
Failed 15 Times in 3 Posts
| Quote:
Originally Posted by dton13 B
we were quoted labour and materials on square footage. At $6 for materials and ~$3 for labour, 172 sq/ft is no joke.
I've been super busy but we're in midst of sorting things out, will post updates soon. | Was the flooring material a special order or was it a stocked item? Most of the times if the flooring u purchased is a non stocking item, there is a no return policy on it. So when I have clients that needs flooring done, my flooring guys just give them straight up a "finished" price
|
| | |