08-24-2016, 04:05 PM
|
#51 | Fathered more RS members than anybody else. Who's your daddy?
Join Date: Aug 2002
Posts: 24,975
Thanked 11,669 Times in 4,988 Posts
Failed 316 Times in 202 Posts
|
For some reason, the Pattullo Bridge reminds me of this..............
__________________ Quote:
"there but for the grace of god go I"
| Quote:
Youth is, indeed, wasted on the young.
| YODO = You Only Die Once.
Dirty look from MG1 can melt steel beams.
"There must be dissonance before resolution - MG1" a musical reference.
|
| |
08-29-2016, 08:20 AM
|
#52 | Witness protection
Join Date: Apr 2001 Location: GVRD
Posts: 14,427
Thanked 5,343 Times in 2,222 Posts
Failed 111 Times in 57 Posts
|
just went over the bridge today. wow it's rough... it's rough concrete with no ashpalt on top, so it's a bumpy ride. if you are on an aftermarket suspension... enjoy.
__________________ "The guy in the CR-V meanwhile, he'll give you a haughty glare. He's responsibly trying to lessen his impact, but there you go lumbering past him with your loud V8, flouting the new reality. You may as well go do some donuts in a strawberry patch and slalom through a litter of kittens." Dan Frio, Automotive Editor, Edmunds
|
| |
08-29-2016, 09:52 AM
|
#53 | RS has made me the bitter person i am today!
Join Date: Feb 2013 Location: Vancouver
Posts: 4,865
Thanked 7,763 Times in 2,315 Posts
Failed 409 Times in 181 Posts
| Quote:
Originally Posted by DragonChi TBH they should just combine the rail bridge beside it too so that the rail company can pitch in for the infrastructure. | Have you ever stopped to wonder why there are so few combined rail/road bridges?
1. Trains weigh a fuck of a lot.
2. Trains can't climb inclines and declines like cars.
3. There are MAJOR engineering and structural ramifications to building a combined bridge.
4. Incidents by either the road using portion, or train moving portion could leave the other portion unusable.
5. What about pedestrian and bicycle traffic - you have to be conscious of their safety as well.
So:
1. Because of the weight of a train, train bridges require a lot more intermediate supports than a regular car or pedestrian bridge. Which means that might restrict the size of the boats trying to get into the channel. It also means that you want to the bridge as low as possible (without interfering with boat traffic), because you don't want to build 15 supports which are 100m high instead of 15 supports which are 20m high.
2. Because train's don't deal with large slopes very well, rail bridges are often built as level to the tracks on either side as possible. I'm sure you've noticed how many rail bridges are either the dual active style (lifting) or Bi-Directional (rotating) to allow taller ships to get through. This isn't because they like fancy engineering, it's because that's a cheaper option than building a tracks at a 3 degree slope for 10 miles in each direction to make up the height to get the trains up to the height at which the Patullo operates.
There's a lot of other considerations as well, but lets just leave it at this; particular location, a long with literally 98% of other train crossings will never be mixed with general road use.
There is actually under 100 combined bridges in the entire world. You can see an entire list here: https://en.wikipedia.org/wiki/List_o...93rail_bridges |
| |
08-29-2016, 09:55 AM
|
#54 | Witness protection
Join Date: Apr 2001 Location: GVRD
Posts: 14,427
Thanked 5,343 Times in 2,222 Posts
Failed 111 Times in 57 Posts
|
a bit of trivia... the burrard street bridge was designed to be a 2-level bridge with cars on top and trains down below, which is why it looks like it does... but the train part was never done
__________________ "The guy in the CR-V meanwhile, he'll give you a haughty glare. He's responsibly trying to lessen his impact, but there you go lumbering past him with your loud V8, flouting the new reality. You may as well go do some donuts in a strawberry patch and slalom through a litter of kittens." Dan Frio, Automotive Editor, Edmunds
Last edited by thumper; 08-29-2016 at 10:00 AM.
|
| |
08-29-2016, 10:03 AM
|
#55 | RS has made me the bitter person i am today!
Join Date: Feb 2013 Location: Vancouver
Posts: 4,865
Thanked 7,763 Times in 2,315 Posts
Failed 409 Times in 181 Posts
| Quote:
Originally Posted by thumper a bit of trivia... the burrard street bridge was supposed to be a 2-level bridge with cars on top and trains down below | The rest of the train corridors in the area have since shut down, so it would have been an incredible waste. I'm talking about the lines that used to run by arbutus, down to Granville island, and down broadway to wherever that Labatts brewery used to be.
I guess had they done that though, the lower decks today could have been converted to pedestrian and cyclists. Instead of the ongoing 20 year battle we have seen between what to do with that bridge (and the 10 years of construction it's been under while they try to decide).
|
| |
08-29-2016, 09:15 PM
|
#56 | My homepage has been set to RS
Join Date: May 2001 Location: New Westminster
Posts: 2,339
Thanked 357 Times in 165 Posts
Failed 41 Times in 24 Posts
| Quote:
Originally Posted by meme405 Incredible they managed to do something in a shorter than intended time period.
This company who did this work should be bookmarked and used again. Knowing translink though they probably wont... | A classic case of under promise and over deliver.
They had planned for this opening, as back to school traffic would be a shit show with the current bridge situations. If they promised this date and missed it, the lynch mob would be out of Translink's head. Now they look like rockstars for delivering a month early, which isn't really the case.
|
| |
08-29-2016, 10:00 PM
|
#57 | RS has made me the bitter person i am today!
Join Date: Feb 2013 Location: Vancouver
Posts: 4,865
Thanked 7,763 Times in 2,315 Posts
Failed 409 Times in 181 Posts
| Quote:
Originally Posted by nah A classic case of under promise and over deliver.
They had planned for this opening, as back to school traffic would be a shit show with the current bridge situations. If they promised this date and missed it, the lynch mob would be out of Translink's head. Now they look like rockstars for delivering a month early, which isn't really the case. | I don't doubt it, but as someone who deals with these scenarios over and over let me take the time to tell you what happens normally which results in over budget and over schedule projects. Keep in mind I deal with private sector shit, I have done public works before, and Hydro projects, but by and large I do stuff for large companies. Not to say some variation of this doesn't happen with public works:
When a project first goes through feasibility they figure out a base schedule, and a base budget. This budget and schedule are based on the very bare metrics. AKA the plant produces 45 megawatts, other 45 megawatt facilities costed 100 mil when they were completed and took 2 years. Or the facility is 60 tons per day, other 60 TPD facilities costed 500 million and took 1.5 years to complete.
They then take that budget and schedule to the owners, and the owners ask for them to try and bring the number down, so they pull their tricks, and lower the numbers 10%. The owners then take that number and go to their financiers and present it, and over and over the financiers say no. So the owners continue to go back to the engineers and planners until they beat the number down another 20%, then the financiers finally green light the project for engineering.
Now finally detailed engineering can start. The engineers make a series of recommendations some of which the owners opt for, which may be slightly out of their budget. So eventually when the package is complete and the project goes out to tender for suppliers and contractors, the bids come back much higher than the budget and schedule allow. So the owners come back and ask for value engineering, they manage to bring the numbers down 10%, thats not enough, so the owner takes risk off the contractors, and removes the liquidated damages clause and the pulls all the money they can out of every nook and cranny to move forward on the project.
Now they have no contingency money, no backup plan, and their schedule is compressed as if it had been put through a trash compacter. Of course they fucking fail, there was no shot in hell from the beginning of the project. Then they all cry, and a bunch of people lose their jobs when the project ends up being exactly where the bare metrics told them it would be 2 years earlier.
The project is then added to all the historical data, and 2 years later when the owners go to another project they are doomed to repeat all the same mistakes, because nobody ever learns anything from the fucking lessons learned that I make for these projects.
|
| | | |