Anyone mind giving me a quick quote on how much this would cost for plumbing? Would really appreciate it!
The below picture is my tub plumbing... The problem is the the water faucet part is to low and my new tub will cover over it.. also need to slightly change/extend the tubing for the overflow and where the general waste water goes.
I aint no plumber but from what I see all that really needs to be done is.
- A: needs to be cut and pulled up higher to fit the tub
- B: both need to be cut (to allow the pull up) then reconnected by putting extension pieces in
- C: cut and resized to fit new bathtub
Edit: Got a quote from a contractor(over the phone) - he said the job would probably take about 2-3 hours, labour + material would be MAX $400.. said he would have to see the site before making a better estimate.
(Pretty much told him what I said above.. minus the picture)
Some input would be awesome. Thanks!