View Single Post
Old 09-09-2012, 04:08 PM   #837
MindBomber
Wanna have a threesome?
 
MindBomber's Avatar
 
Join Date: Oct 2010
Location: Squamish
Posts: 4,888
Thanked 5,054 Times in 1,657 Posts
Failed 439 Times in 203 Posts
Quote:
Originally Posted by SpuGen View Post
Fucked up while drilling the floor for the lift.

Might take even longer since I now need to get the section cut out, and filled.

FML.

Never do precision work with 2 hours of sleep.

It's not really that bad. I just feel like a fuckin idiot.
2 of the anchors on one side have more than 1/8th of play. Which just screams unsafe.

If anybody knows a concrete contractor, let me know.
There are lots of options other than cutting out and replacing a portion of the slab.

Hydraulic cement, epoxy, a larger anchor.