Quote:
Originally Posted by Hot Karl
that's a load of crap. hvc job ended because it was done. i was at that job. not to say jv is perfect but they did not get kicked off for safety issues.
i was on nights and was laid off in january like the entire night shift, job lasted for another 2-3 weeks and the skeleton crew left on days was then laid off.
/currently in cold lake at a jv job
|
I didn't say there was much more behind that than a rumour. I just hear these things through the grapevine.
I assume you are LOA at cold lake? Whats the rate?