|
Any chance the existing floor is glued down? I recently demo'd a glued down, engineered hardwood floor, where the rubber underlay was also glued to the concrete subfloor. It was a massive pita. The subfloor had to be scraped down as well. Took 3+ days to have it ready for install. This is the only reason i can think of, where going over existing might remotely be considered. Having said that, if it were my place, I'd still demo it, 100% first
__________________
feedback
Originally posted by v.b.
can we stop, my pussy hurts...
Originally posted by asian_XL
fliptuner, I am gonna grab ur dick and pee in your face, then rub shit all over my face...:lol
Originally posted by Fei-Ji
haha i can taste the cum in my mouth
Originally posted by FastAnna
when I was 13 I wanted to be a video hoe so bad
RSUV #7
|