View Single Post
Old 11-26-2016, 06:50 PM   #50
murd0c
In RS I Trust
 
murd0c's Avatar
 
Join Date: Mar 2003
Location: Mission
Posts: 20,824
Thanked 17,684 Times in 4,357 Posts
Failed 1,037 Times in 352 Posts
started work today at 830 and just finished. Ended up tearing off all the drywall in the kitchen, ripped up some of the floor, plumed in the dishwasher and dryer full and got the pet pipe setup for once the cabinets are installed.

The last two pics are of my basement ceiling, I had to rip down all the drywall so the electrician can feed the wires through easier.

Not bad for a days work I think and just think all of these work has been done the last 3 Saturdays. Going to Calgary next weekend so thankfully I have a short break after today.


The kitchen floor sucks, theres lino, then particle board which is of course nailed down with tons of nails all over and then more lino underneath that.












Last edited by murd0c; 11-26-2016 at 06:55 PM.
murd0c is offline   Reply With Quote
This post thanked by: