View Single Post
Old 07-10-2017, 11:32 PM   #10128
Mr.C
Even when im right, revscene.net is still right!
 
Mr.C's Avatar
 
Join Date: Aug 2010
Location: Richmond
Posts: 1,349
Thanked 1,776 Times in 444 Posts
Failed 195 Times in 67 Posts
Quote:
Originally Posted by Hondaracer View Post
The majority of the big builders who've been around for a while are fine. Bosa, Onni, metro-can, Urban one, etc.

There is a huge difference between mechanical/electrical/build problems than with finishing details. Doors jamming, nail pops, flex in floor etc. are almost accepted these days because builds go so fast builders rarely have time to go back after a unit has been sitting prior to turn over. Things settle, moisture evaporates, caulking cracks, etc.

Just because people have a mindset that they paid X amount their unit should be absolutely perfect isn't the reality. It's kind of a funny switch of roles in most cases because developers and builders obviously spend the most time going over their most expensive units with a fine tooth comb to make sure they are perfect, when in most cases the people buying the high end units seemingly don't give a shit about the small imperfections that the people buying the lower end units do
Hey, I mean, if you're cool spending a million bucks on an overpriced shoebox where they can't even get the fit and finish right, go on ahead I guess.

It never ceases to amaze me how people are completely irrational when it comes to real estate here in Vancouver.
__________________
Have an E38? Check out E38Registry.org!

http://www.e38registry.org/
Mr.C is offline   Reply With Quote
This post thanked by: