Quote:
Originally Posted by twitchyzero
90% of Canadians live by the 49th parallel
DJI flying cameras few years ago had their battery heated, i think winter temps are the least of the hurdles
the heaviest of HD work rigs will probably stay on diesel, did you even read the first sentence of the source?
how much more power is going to be generated from Site C?
|
Horgan is referring to zero emission vehicles that are classified as light duty passenger vehicles. That would be vehicles with a GVWR of less than 3860 kg (8500 lbs). The work trucks described in this thread would not meet that classification.
Site C will provide up to 1.1 gigawatts.