Quote:
Originally Posted by Traum
- canning the Massey tunnel replacement bridge -- work had already begun on it, and they should have just continued with it. The region would have had a newer and bigger bridge sooner, and it would have cost less.
|
I actually knew someone working on the engineering plans for the bridge, they HAD to can the bridge... the runup required for it was baically going to skip the entire Steveston Hwy exit and River Rd exits... it was an unmitigated disaster from the start with numerous structural and land challenges as well.
Twinning the tunnel should have been the only option from the start.