Quote:
Originally Posted by 68style
I actually knew someone working on the engineering plans for the bridge, they HAD to can the bridge... the runup required for it was baically going to skip the entire Steveston Hwy exit and River Rd exits... it was an unmitigated disaster from the start with numerous structural and land challenges as well.
Twinning the tunnel should have been the only option from the start.
|
Things like that, if true, should have been released to the public to support the reason instead of letting ppl bitch about it.