View Single Post
Old 04-13-2024, 05:22 PM   #4067
Traum
RS.net, helping ugly ppl have sex since 2001
 
Traum's Avatar
 
Join Date: Aug 2007
Location: Paradise, BC
Posts: 8,381
Thanked 8,148 Times in 3,389 Posts
Failed 262 Times in 148 Posts
Quote:
Originally Posted by 68style View Post
I actually knew someone working on the engineering plans for the bridge, they HAD to can the bridge... the runup required for it was baically going to skip the entire Steveston Hwy exit and River Rd exits... it was an unmitigated disaster from the start with numerous structural and land challenges as well.

Twinning the tunnel should have been the only option from the start.
What EvoFire said was the first thing that came to my mind as well, and I don't recall seeing any news about anyone in the NDP gov explaining that the Steveston Hwy and River Road exits not being there.

I don't think the existing Massey Tunnel is seismically safe, which is why a replacement of some sort is needed. So I don't think we can just twin it (ie. build a new one alongside) and call it a day.
Traum is offline   Reply With Quote